How Long Does it Take?

 

The process may take longer if a loan is required, and, depending on the source of the loan, difficult to estimate.  Therefore, no loan delays are included.

Five to six weeks is about the minimum time from the decision to do it to store opening provided that a suitable store is located and is available in time.  It could take up to six months if processing a loan is involved.

Home-Button.gif (17007 bytes)